Types of Testing and Commissioning in Fire Fighting System - LCETED

Testing and Commissioning in FFS Construction Works | FFS (Fire Fighting System) Package Factory Acceptance testing (FAT) | FFS (Fire Fighting System) Package Site Acceptance testing (SAT) | FFS (Fire Fighting System) Package Test Reports in Excel Sheet | FFS (Fire Fighting System) Package List of Tests | Sprinkler System Testing and Commissioning Requirement Compliance Sheet | FFS (Fire Fighting System) Systems List of Tests 


In this article, we have listed out Types of FFS (Fire Fighting System) Package Testing and Commissioning on factories and Sites for construction works and Test Instrumentation Required/Considered for Site Acceptance Testing (SAT)


Testing and Commissioning in Fire Fighting System


Following is the FFS (Fire Fighting System) that shall be carried out in construction works

 

TYPES OF TESTING AND COMMISSIONING ON SPRINKLER SYSTEM

1. Physical inspection and specs. Verification - This has to be carried out as per the Pre-Cx check sheet given in the commissioning plan/method statement.

 

2. Pressure testing - For Pipe works pressure test to be done at 13.8 kg/cm² for 2hrs. without any pressure drop as per NFPA 13 followed by line flushing.

 

3. "Flow Switch Operation Verification - Open the drain valve of the system and allow the water to pass from the line and observe the alarm/hooter or water flow status in the BMS system."

 

4. "Integration with Landlord - Verify the alarms ON BMS status of flow switches and tamper switches of landlord systems."

 

TYPES OF TESTING AND COMMISSIONING ON HYDRANT SYSTEM

1. Physical inspection and specs. Verification - This has to be carried out as per the Pre-Cx check sheet given in the commissioning plan/method statement.

 

2. Pressure testing - For Pipe works pressure test is to be done at 13.8 kg/cm² for 2hrs. without any pressure drop as per NFPA 13 followed by line flushing.

 

 TYPES OF TESTING AND COMMISSIONING ON FIRE-EXTINGUISHERS

1. Installation Verification as per the approved layout

 

 TYPES OF TESTING AND COMMISSIONING ON FIRE-EXTINGUISHERS

1. Installation verification as per approved layout

 

Test Instrumentation Required/Considered for FFS (Fire Fighting System) Site Acceptance Testing (SAT)

 

Test Instrumentation Required/Considered for FFS

Following is the Test Instrumentation Required/Considered for Site Acceptance Testing (SAT) of the FFS (Fire Fighting System)

1. True RMS Multi-meter - 1 No.

2. Pressure Gauge - 1 No.

3. Hydraulic Pump - 1 No.

4. dB Meter - 1 No. 

NOTE: Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT)


CLICK TO DOWNLOAD EXCEL SHEET