QUANTITY SURVEY


















The Dimension Of This Slab

Length – 6m or 20 feet
      
Breadth – 6m or 20 feet  
   
Depth – 0.150m or 0.5 feet 
  
Grade of concrete – M20

M20 Mix Ratio  = 1 : 1.5 : 3

The Mix Ratio Denotes The Following

1 – Cement      

1.5 – Sand (Fine aggregate – 1.5 Times of Cement Quantity)  

3 – Blue metal (Coarse aggregate – 3 Times of Cement Quantity)

Volume of concrete we need = length x breadth x depth =
L x b x h = 6 x 6 x 0.15 = 5.4 m3

OK

First, we can find the volume of concrete for 1m3 so we can use on different volume   

The volume of 1m3 concrete

We find out the volume of concrete in wet condition 1m3 (After the consolidation of Cement + sand + water). So in dry conditions, we have to add 30 to 35% sand bulkage and add 20% for wastage.

Accounting bulkage of sand - 34%

Accounting wastage of material -20%

Hence 1 cum becomes 1.54 (1+0.34+0.2) cum

Total Part of the Concrete = 1+1.5+3 = 5.5 Parts

Calculation of Volume of Cement in 1m3 of Concrete

Cement Quantity= (Cement Part / Concrete Parts) x Concrete Volume

Cement part = 1 (1:1.5:3)

Concrete parts = 1+1.5+3 = 5.5 Parts

Density of cement - 1440 kg/cum

Cement = (1/5.5) x 1.54 = 0.2798

Density of Cement = 1440 kg/ m3 = 0.2798 X 1440 = 403.19 kg

1 Cement Bag  Weight = 50 Kg

Hence 403.29/50 = 8.06 bags

LCETED TRIVIA
To be simple

Volume of,

One cement bag = 0.0347 cum

One cement bag = 1.225 cft

1 cft box = 1*1*1.25 ft
HOW TO CALCULATE CONCRETE QUANTITY

Hence Required cement = ((1/5.5) x (1.54))/(0.0347) = 8.06 bags


Calculation of The volume of sand in 1m3 of Concrete

Sand Quantity= (sand Part / Concrete Parts) x Concrete Volume

Sand part = 1.5 (1:1.5:3)

Concrete parts = 1+1.5+3 = 5.5 Parts

Density of sand = 1500–1550 kg/cum

Sand = (1.5/5.5) x 1.54 = 0.42

Density of Cement = 1500 kg/ m3 = 0.42 X 1500 = 630 kg

But we all are buying sand in cft

Therefore,
1 Cum = 35.31 Cft
Sand Quantity = 0.42

= 0.42 x 35.31= 14.83 Cft

100 cft = 1 Unit

2.83 cum = 1 unit

1 load - 4 unit

Generally on lifting for sand, 1 unit sand equals 35 cement bags of sand

1 cft box = 1 x 1 x 1.25 ft

HOW TO CALCULATE CONCRETE QUANTITY


Calculation of Volume of aggregate in 1m3 of Concrete

Aggregate Quantity = (sand Part / Concrete Parts) x Concrete Volume

Aggregate part = 3 (1:1.5:3)

Concrete parts = 1+1.5+3 = 5.5 Parts

Density of aggregate = 1520 - 1680 kg/cum

Aggregate = (3/5.5) x 1.54 = 0.84

But we all are buying aggregate in cft

Therefore,
1 Cum = 35.31 Cft
Aggregate Quantity = 0.82

= 0.84 x 35.31 = 29.66 Cft

Total Materials Required for 1m3

Cement - 8 bags

Sand - 14.83 Cft

Aggregate - 29.66 Cft

Therefore,
We need the volume of concrete for 5.4m3

Cement = 5.4 x 8 ( 8 bag of cement for 1m3) = 43.2 – 43 bags

Sand = 5.4 x 14.83 (14.83 cft of sand for 1m3) = 80.08 cft

Aggregate = 5.4 x 29.66 (29.66 cft of aggregate for 1m3) = 160.164 cft

Total Materials Required for 5.4m3

Cement - 43 bags

Sand – 80.08 Cft

Aggregate – 160.164 Cft

LCETED TRIVIA

Smaller size aggregate's price little high than the larger size
Generally, we use 40 mm aggregate instead of 20mm in PCC for cost-effective

Calculation of Volume of water in 1m3 of Concrete

Water cement ratio 0.5 for a bag = 0.5 x 50 ( weight of a bag) = 25 litre

Therefore,
We have 43 bags so 25 litre x 43 = 1075 litre

LCETED TRIVIA

1 drum = 200 (208) litre

So,

For 43 bags = 1075/208 = 5.16 drums





As LCETED civil engineer, you should know how to use the Excel sheet to find this quantity. so use this sheet for your uses

You Can Change This Value As Per Your Specification 





Download it by clicking the link


LCETED TRIVIA

QUANTITY IN CONCRETE?

















.








LCETED INSTITUTE FOR CIVIL ENGINEERS


Our Mission To Educate And Keep People Informed By Creating A Trusted Source Of Knowledge Everything Related To Civil Engineering”. 




6 comments:

  1. Awesome ..

    ReplyDelete
  2. In the event that you are in any uncertainty about laying the paving, it very well might be a plan to look for proficient assistance.
    paving

    ReplyDelete
  3. Depending on the kind of building, a concrete structure may consist of beams, slabs, columns, and foundations, among other things. By adding up the volumes of all the structural components or individual portions of members, one may determine the volume of concrete needed for a concrete construction. The formula for calculating the volume of a rectangular cross sectional member is length x width x height (or depth x thickness). Suitable formulas must be utilized for various cross-sectional member shapes.

    ReplyDelete
  4. "Epoxy garage floors are resistant to chemicals, making them ideal for car enthusiasts." Garage Floor Epoxy

    ReplyDelete

LCETED - "WHATSAPP GROUP"

For Instant updates Join our Whatsapp Group. Save our Whatsapp contact +919840140396 as LCETED and Send us a message “JOIN”

Post Bottom Ad