Plastering Work Checklist Format | Wall plastering Checklist pdf format | lceted

In this article, we have attached a pre-plastering preparation checklist, cement mortar mixing & during plastering checklist and final plastering finishes checklist for the engineers

 

Wall plastering Checklist pdf format


CLICK TO DOWNLOAD THE PLASTERING WORK CHECKLIST

PLASTERING WORK CHECKLIST

 

 

 

What is plastering work?

Plastering is the process of covering the rough and uneven surfaces of walls, columns, beams, ceilings and other building elements with one or two coats to make the surface smooth and durable. Generally, plaster is a mixture of lime or cement and sand with the required amount of water


 

 

Also use: Plastering Calculator | Calculation of Materials For Plastering | SQFT | SQM


PRE-PLASTERING PREPARATION CHECKLIST

1. Setting out as per base reference line/drawing

2. Sufficient level pegs provided and wall alignment is acceptable

3. All first fixed joinery items are fixed accordingly

4. All concealed M&E services are complete and ready. M&E Engineer confirmed to proceed

5. Protection provided to installed components/ finishes

6. Wire mesh provided between RC structure and brickwork

7. Mortar spread on the walls yet to be plastered is cleaned

8. Architectural items such as corner beads, U-grooves, copings and sides of jamb are completed prior to plastering work

9. All finished works are well protected prior to plastering work

10. Checked wall's moisture content is acceptable and ensured wetting of substrate before plastering, use Moisture Meter

Also Read: Things you want know about wall plastering


CEMENT MORTAR MIXING & DURING PLASTERING CHECKLIST

 

1. Setting out as per base reference line/drawing

2. Sufficient level pegs provided and wall alignment is acceptable

3. All first fixed joinery items are fixed accordingly

4. All concealed M&E services are complete and ready. M&E Engineer confirmed to proceed

5. Protection provided to installed components/ finishes

6. Wire mesh provided between RC structure and brickwork

7. Mortar spread on the walls yet to be plastered is cleaned

8. Architectural items such as corner beads, U-grooves, copings and sides of jamb are completed prior to plastering work

9. All finished works are well protected prior to plastering work

10. Checked wall's moisture content is acceptable and ensured wetting of substrate before plastering, use Moisture Meter

 

FINAL PLASTERING FINISHES CHECKLIST

1. Visually acceptable smooth surface with no scratches

2. Checked the evenness, line, plumb etc., using a straight edge with respect to button marks

3. All button marks are carefully removed and properly finished after all checking

4. Checked there is no surface damage or cracks and surface is free from major defects

 

 

 

Also Read: Methods used To Calculate Plastering Material Quantity 


 