Aug 26, 2024

Change Authorization Request Form: An Essential Tool for Project Managers

26 August 0
Change Authorization Request Form: An Essential Tool for Project Managers A Change Authorization Request (CAR) form documents, approves, and tracks changes for a given project. Changes on projects are pretty common; in construction or interior design, the needs of a client may be changed, site conditions may require changes, or other factors. It ensures that all changes are valued, approved, a…
Read More

Aug 11, 2024

What Are the Risks of Poor Contracts Management in Construction? - Lceted

11 August 0
Understanding Contracts in Construction Projects Contracts are the backbone of any construction project, serving as the legal framework that governs the relationships between the various parties involved. According to the classic legal definition, a contract is a promise or several promises under which the law recognizes a duty to perform, and for which a breach is actionable. In simpler terms, a…
Read More

May 27, 2023

Apr 22, 2023

When to issue a Non-conformity Report (NCR)? | Non-conformity Notice (NCN) - teamlceted

22 April 0
How To Report Construction Quality Issues?| When to issue a Non-conformity Report (NCR)? | When to issue a Non-conformity Notice (NCN)? | Non-Conformance Report (NCR) | How to Prepare Non-conformity Report (NCR) | Non-conformity Report (NCR) Format When to issue a Non-conformity Report (NCR)? | When to issue a Non-conformity Notice (NCN)? When an activity/work/test report at the site is not co…
Read More

Apr 15, 2023

Types of Testing and Commissioning in Plumbing Construction Works - lceted

15 April 7
Testing and Commissioning in Plumbing Construction Works |   Plumbing Package Factory Acceptance testing (FAT) |   Plumbing Package Site Acceptance testing (SAT) |   Plumbing Package Test Reports in Excel Sheet |   Plumbing Package List of Tests |   Plumbing Package Testing and Commissioning Requirement Compliance Sheet | Plumbing Systems List of Tests    In this article, we have listed out T…
Read More

Testing and Commissioning in HVAC Construction Works | HVAC Package Testing and Commissioning Requirement Excel Compliance Sheet

15 April 0
Testing and Commissioning in HVAC Construction Works |   HVAC Package Factory Acceptance testing (FAT) | HVAC Package Site Acceptance testing (SAT) | HVAC Package Test Reports in Excel Sheet | HVAC Package List of Tests | HVAC Package Testing and Commissioning Requirement Compliance Sheet |  HVAC Systems List of Tests     In this article, we have listed out Types of HVAC Package Testing and Commi…
Read More

Feb 28, 2023

What Is Material Inspection Report? | Construction MIR format download | MIR format

28 February 0
The Material Inspection Receiving Report provides you information about incoming material inspection at the Construction site and controls all incoming materials for construction. As soon as equipment and material are delivered at a construction site, the receiving inspection must be performed by the site engineer/Project head/HOD/Storekeeper using the material inspection report. If any devia…
Read More

Feb 10, 2023

What are the forms to obtain before starting a Construction project in India?

10 February 0
What are the forms to obtain before starting a Construction project in India?   1. Form I Rule 17(1): Application for Registration of Establishments Employing Contract Labor   2. Form II Rule 18(1): Certificate of Registration   3. Form III Rule 18(3): Register of Establishments          4. Form IV Rule 21(1): Application for License   5. Form V Rule 21(2): Form of Certif…
Read More

Jan 26, 2023

How to Prepare HSE/Safety Plan for Construction | HSSE Requirements | Site Setup Requirements

26 January 0
How to Prepare HSE/Safety Plan for Construction | HSSE Requirements | Site Setup Requirements | Checklist And Permits Frequency to follow on site In this article, we have attached HSSE requirements, Site set-up requirements, Checklist and permits required, and frequency with other implementations that need to adhere to at the site for safety precautions. HSSE REQUIREMENTS 1. Dedicated HSSE pers…
Read More

Jan 22, 2023

How to Prepare Project Schedule for Construction Site | Project Schedule Format - Lceted

22 January 1
What is Construction Project Schedule? A construction schedule is a complete blueprint of how a project will be executed and when it will be executed, we can have sequence of each job and define the resources needed and the teams responsible for each task in the construction process. A construction schedule will indicate project timelines/milestones and tracks project progress to keep everything …
Read More

Jan 21, 2023

How To Prepare Construction Project material tracker? | Material tracker Format

21 January 0
In this article, we have explained material tracker uses and how to prepare it for your project A construction project cannot progress without construction materials. Whether you're working on interior fit-out or base build. Need Detailed planning is involved in managing thousands of line items across the supply chain and material tracking systems are used to control the supply and delivery…
Read More

Jan 17, 2023

What Is a Work Permit? Types of Work permit used in Construction work | LCETED

17 January 0
What Is a Work Permit? A work permit is a written form used to authorize jobs that endanger workers to serious hazards. It recognizes the work to be done, the hazards involved, and the necessary preparation and precautions for the job. Examples of jobs needing work permits are those requiring employees to enter and work in confined spaces, repair, maintain, or inspect electrical installations, or…
Read More