How to Prepare HSE/Safety Plan for Construction | HSSE Requirements | Site Setup Requirements

How to Prepare HSE/Safety Plan for Construction | HSSE Requirements | Site Setup Requirements | Checklist And Permits Frequency to follow on site

In this article, we have attached HSSE requirements, Site set-up requirements, Checklist and permits required, and frequency with other implementations that need to adhere to at the site for safety precautions.


HSSE REQUIREMENTS

1. Dedicated HSSE personal deployment.

2. Site-specific PSP – project safety plan

3. HSSE policy

4. Project Risk Assessment (HIRA) - Site Specific (COVID-19 Precautions need to incorporate)

5. SWMS - For All Works (COVID 19 Precautions need to incorporate)

6. Logistic plan – site-specific

7. PPE Matrix

8. EVAC Insinuation plan (Floor) and ERP plan

9. HSSE training matrix – Including Third party training

10. Waste Management plan


Description

Responsibility

Target Date

Dedicated HSSE personal deployment.

 

 

Site-specific PSP – project safety plan

 

 

HSSE policy

 

 

Project Risk Assessment (HIRA) - Site Specific (COVID-19 Precautions need to incorporate)

 

 

SWMS - For All Works (COVID 19 Precautions need to incorporate)

 

 

Logistic plan – site-specific

 

 

PPE Matrix

 

 

EVAC Insinuation plan (Floor) and ERP plan

 

 

HSSE training matrix – Including Third party training

 

 

Waste Management Plan

 

 


How to Prepare HSE/Safety Plan for Construction


SITE SETUP REQUIREMENTS

1. HSSE Checklist needs to be filled

2. Nearest Hospital tie up letter 24X7

3. Emergency contact numbers display with the designation.

4. HSSE Notice board and Safety Park

5. HSSE Statistics Board

6. ID cards for workers

7. Visitor induction card and visitor entry register

8. First Aid Box – First Aid Qualified members

9. HSSE Job specific posters (3/2 Standard Size – CW & Client LOGO SHOULD BE INCLUDED

11. Fire extinguisher Min 15 points and 3 fire stands (DCP & CO2)

12. IP Standard temporary power DB – Earthing should be ensured

13. Double-insulated armored cables only use for power tapping

14. Aluminum Mobile scaffold only allowed inside the premises & Daily Inspection and record maintaining

15. “A” Type ladders are not at all allowed from the initial stage of the project works.

16. Segregation of wastages

17. Implementation of work permits

18. MSDS display at site

19. Medical certificates for workers and staff

20. Designated area for Lunch for workers

21. Statutory Documents updates

        WCP

        CAR

        LABOUR LICENSE

        ISMW

        ESI & PF – Registration Copy

        ESI & PF – Challan Copy

22. Deployment of B certificate electrician at site

23. Drinking water facility at the floor

24. Worker’s toilets need to be identified and deployment of the cleaning team

25. Openable window closing/Façade protection

26. Exhaust & Industrial fan for air ventilation


Description

Responsibility

Target Date

HSSE Checklist need to be filled

 

 

Nearest Hospital tie up letter 24X7

 

 

Emergency contact numbers display with designation.

 

 

HSSE Notice board and Safety Park

 

 

HSSE Statistics board

 

 

ID card for workers

 

 

Visitor induction card and visitor entry register

 

 

First Aid Box – First Aid Qualified members

 

 

HSSE Job specific posters (3/2 Standard Size – CW & Client LOGO SHOULD BE INCLUDED

 

 

Fire extinguisher Min 15 points and 3 fire stands (DCP & CO2)

 

 

IP Standard temporary power DB – Earthing should be ensured

 

 

Double insulated armored cables only use for power tapping

 

 

Aluminum Mobile scaffold only allowed inside the premises & Daily Inspection and record maintaining

 

 

“A” Type ladders are not at all allowed from the initial stage of the project works.

 

 

Segregation of wastages

 

 

Implementation of work permits

 

 

MSDS display at site

 

 

Medical certificates for workers and staff

 

 

Designated area for Lunch for workers

 

 

Statutory Documents updates

 

 

WCP

 

 

CAR

 

 

LABOUR LICENSE

 

 

ISMW

 

 

ESI & PF – Registration Copy

 

 

ESI & PF – Challan Copy

 

 

Deployment of B certificate electrician at site

 

 

Drinking water facility at floor –

 

 

Worker’s toilets need to be identified and deployment of cleaning team

 

 

Openable window closing/Façade protection

 

 

Exhaust & Industrial fan for air ventilation

 

 


CHECKLIST AND PERMIT FREQUENCY

1. Accident Incident Report Format - As and when required

2. HSSE Statics weekly & Monthly - Once in a month 1st to 2nd & Every Friday

3. A Type ladder – Checklist - Once in a week

4. Checklist for ELCB - Once in a month

5. Fire extinguisher checklist - Once in a Week

6. Full body harness checklist - Once in a Week

7. Gas cutting set checklist - Once in a week

8. Height work Checklist - Daily

9. Mobile scaffold Checklist & Tagging - Once in a week

10. Power tool Checklist & Tagging - Once in a week

11. PPE Checklist - Once in a week

12. Welding Machine checklist & Tagging - Once in a week

13. Confined Space Entry Permit - As and when required

14. General Work Permit  - Daily

15. Height Work Permit - Daily

16. Hot Work Permit - Daily

17. Night Work Permit - Daily

18. Medical Fitness form - All new workers & Staff

19. Safety Induction Record Format - All new workers & staff

20. JST - Attendance Sheet - Once in a week

21. TBT - Daily


Description

Frequency

Remarks

Accident Incident Report Format

As and when required

 

HSSE Statics weekly & Monthly

Once in a month 1st to 2nd & Every Friday

 

A Type ladder – Checklist

Once in a week

 

Checklist for ELCB

Once in a month

 

Fire extinguisher checklist

Once in a Week

 

Full body harness checklist

Once in a Week

 

Gas cutting set checklist

Once in a week

 

Height work Checklist

Daily

Before commencement of work

Mobile scaffold Checklist & Tagging

Once in a week

 

Power tool Checklist & Tagging

Once in a week

 

PPE Checklist

Once in a week

 

Welding Machine checklist & Tagging

Once in a week

 

Confined Space Entry Permit

As and when required

 

General Work Permit

Daily

Before the commencement of work

Height Work Permit

Daily

Before the commencement of work

Hot Work Permit

Daily

Before the commencement of work

Night Work Permit

Daily

Before the commencement of work

Medical Fitness form

All new workers & Staff

 